|
|
|
Aerial view looking north of the Falls Road Bridge location just off of Route 98
|
|
|
|
Sept 26--Old bridge at start of project
|
|
|
|
Sept 27--Existing bridge demolished
|
|
|
|
|
Sept 27--Parapet walls removed
|
|
|
|
Sept 28--Old bridge deck removed and waste materials stockpiled for removal
|
|
|
|
Sept 27--Stream channel temporarily narrowed during construction
|
|
|
|
|
Sept 29--Track hoe digs south west wingwall footer
|
|
|