2005-2006 Falls Road Bridge

Replacement Project

 

 

June 2006

June 6--Parapet walls are poured today

June 6--Concrete is thoroughly vibrated to remove any air pockets and insure uniformity of the concrete.

June 6--Top of the wall is smoothed and finished by hand.

June 15--Subbase is being prepared for asphalt placement.

June 20--Paving is completed today

June 20--Asphalt is placed over a newly installed 6" subbase of gravel

June 20--Asphalt is placed in one lane and then the other

June 20--4 1/2" base course to be followed by a 1 1/2" wearing course.

June 21--Guiderail installed today by Penn Line Service

Ken Huff (L), project foreman talks with Dennis Morian, Director of Engineering for Quality Engineering Solutions

Superintendent Rankin Montgomery of Quality Engineering Solutions, operates excavator

Ken Williams, Engineering Inspector, representing Mark Corey, P.E. and Associates, the Township's Engineer and bridge designer